Minokamo II

Minokamo Plant 2 was completed in 2006 as a plant for the production of the new generation world-class NEXUS series of machine tools. Today the plant produces a wide variety of turning centers including 2-axis and  4-axis models as well as ones with two opposing spindles. 

To ensure the optimum environment for the production of high-precision machine tools, the temperature of this factory is strictly controlled by a high-efficiency heating/air-conditioning system, illumination levels are extremely bright and the factory floor is white. The Cyber Spindle Factory, a central spindle production facility for all the Mazak factories in Japan.

Yamazaki Mazak Manufacturing Corporation Minokamo Plant 2
ADDRESS:1-2 Yata, Hachiya-cho, Minokamo City, Gifu-Pref., 505-0009
TEL:+(81)0574-24-1121
FAX:+(81)0574-24-1133

1.Yamazaki Mazak Manufacturing Corporation Minokamo Plant 2

2. Cyber Spindle Factory

 

3. World Parts Center

 


Access

By Car

30 min. from World Headquarter by the car
From Chubu Centrair International Airport Centrair Higashi Inter Change - Chita Peninsula - Isewangan
Expressway - Tokay-Kanjo Expressway - Minokamo Inter Change
About 1 hour and 40 minutes
Follow Tokai-Kanjo expressway from Minokamo interchange. Drive time: 10 min.

By Train

About 8 minutes from JR MINOOTA STA
Meitetsu Nihon Line IMAWATARI STA. Drive time: 15 min.

Access Map